Construction - 2004 

INDEX

  1. 04-01-2004 - Isolation du plafond / Ceiling Insulation
  2. 17-01-2004 - Installation electrique / Electric installation
  3. 08-02-2004 - Connection electrique et pare vapeur / Electric connection and vapor barrier
  4. 21-03-2004 - Pose de la forence / Installation of the nailling
  5. 04-04-2004 - Le debut de la salle de bain / The begining of the bath room
  6. 24-05-2004 - La cuisine / The kitchen
  7. 29-05-2004 - La Salle de bain / The bath room
  8. 27-06-2004 - La finission interieure / The inside finishing
  9. 04-07-2004 - La finission interieure / The inside finishing
  10. 11-08-2004 - La finission interieure / The inside finishing
  11. 01-09-2004 - Le Plancher / The Floor
  12. 06-09-2004 - La finition du plancher et l'isolation / The Floor finishing and insolation
  13. 12-09-2004 - Ont enmenagent / Whe are moving in
  14. 26-09-2004 - Ont a enmenages / Whe moved in
  15. 11-10-2004 - Escalier en colimacon / Spiral stair
  16. 14-11-2004 - debut de la finition exterieur / Start of the outside finishing
  17. 05-12-2004 - Escalier en colimacon - Main courante / Spiral stair - Handrail
  18. 22-12-2004 - La finition exterieur / The outside finishing